Before & after pictures of Project

This property is built on very boggy land, when it rained, water built up around the house and just wasn’t leaving the area. So our client instructed us to install a new 40 meter rain water waste pipe from the main downpipe at the house to the ditch.

We excavated 40 meter of soil, placed the turf on plastic sheeting so that it wouldn’t mark the ground, installed the pipe and back filled in.  We painted the waste pipe black so it blended in the scenery.

We take care with attention to detail and go that extra bit to make a project perfect.

Work was completed in 2 days.

For more information on our Landscaping Services please call Renovision on 01276 536788.

5 Year Workmanship Guarantee as standard and up to 10 Year Build Assure Warranty available.

Finished pictures of Project

Transform your Space

Contact us today for a free consultation and quotation.

Get a free quote